Case Study
Digmaster ProCoastal Construction

Land reclamation and dyke construction

Case Study
Digmaster ProCoastal Construction

Reuse GmbH choose Prolec’s Digmaster Pro for land reclamation works in Büsum, Germany.

Reuse GmbH, a civil engineering company specialising in coastal protection completes a substantial dyke reconstruction project in Büsum, Germany. The sandy beach island ‘Perlebucht’ was raised from 1.6m up to 5.0m in order to withstand the summer storm floods. During this Reuse GmbH moved and placed 77,000 m³ of material. 

In order to achieve the contract requirements, Prolec’s Digmaster Pro 3D GPS machine control was used. This ensured a high level of accuracy was maintained throughout the project plus increased productivity compared with more manual methods.

Stainless steel marine-grade sensors were used in this project due to their ability to operate in harsh saltwater environments. Alongside this, Reuse GmbH required the real-time location of the grad-flo pump to just 10mm accuracy. The proprietary”grad-flo" pump was modelled and input to the software. This meant the driver could see the tool in real-time adding further to the productivity benefits of the system.

The ability to not only import the target but also the current design file enabled the operator to determine where the material still needed to be moved. Utilising a 2D topographical map, laid on top of the design file along with the integrated progress map, made the task simple and efficient. The progress map also allowed for the recording of the daily output as evidence to the contractor. 

All personnel involved in the use of the system said that they noticed the productivity enhancement almost immediately. 

If you would like to know more about how our systems make your land reclamation projects more productive then leave your details below and one of our team will be in touch.